JEDNOSTKA NAUKOWA KATEGORII A+

Artykuły w formacie PDF dostępne są dla subskrybentów, którzy zapłacili za dostęp online, po podpisaniu licencji Licencja użytkownika instytucjonalnego. Czasopisma do 2009 są ogólnodostępne (bezpłatnie).

Stable-$1/2$ bridges and insurance

Tom 104 / 2015

Edward Hoyle, Lane P. Hughston, Andrea Macrina Banach Center Publications 104 (2015), 95-120 MSC: 60G52, 62P05, 62F15, 91B25, 91B30. DOI: 10.4064/bc104-0-5

Streszczenie

We develop a class of non-life reserving models using a stable-$1/2$ random bridge to simulate the accumulation of paid claims, allowing for an essentially arbitrary choice of a priori distribution for the ultimate loss. Taking an information-based approach to the reserving problem, we derive the process of the conditional distribution of the ultimate loss. The “best-estimate ultimate loss process” is given by the conditional expectation of the ultimate loss. We derive explicit expressions for the best-estimate ultimate loss process, and for expected recoveries arising from aggregate excess-of-loss reinsurance treaties. Use of a deterministic time change allows for the matching of any initial (increasing) development pattern for the paid claims. We show that these methods are well-suited to the modelling of claims where there is a non-trivial probability of catastrophic loss. The generalized inverse-Gaussian (GIG) distribution is shown to be a natural choice for the a priori ultimate loss distribution. For particular GIG parameter choices, the best-estimate ultimate loss process can be written as a rational function of the paid-claims process. We extend the model to include a second paid-claims process, and allow the two processes to be dependent. The results obtained can be applied to the modelling of multiple lines of business or multiple origin years. The multi-dimensional model has the property that the dimensionality of calculations remains low, regardless of the number of paid-claims processes. An algorithm is provided for the simulation of the paid-claims processes.

Autorzy

  • Edward HoyleFulcrum Asset Management
    Marble Arch House
    London W1H 5BT, UK
  • Lane P. HughstonDepartment of Mathematics
    Brunel University London
    Uxbridge UB8 3PH, UK
    and
    Department of Mathematics
    University College London
    London WC1E 6BT, UK
  • Andrea MacrinaDepartment of Mathematics
    University College London
    London WC1E 6BT, UK
    and
    Department of Actuarial Science
    University of Cape Town
    Rondebosch 7701, RSA

Przeszukaj wydawnictwa IMPAN

Zbyt krótkie zapytanie. Wpisz co najmniej 4 znaki.

Przepisz kod z obrazka

Odśwież obrazek

Odśwież obrazek